MBO came up short because of a lack of feed back. You always have to look at the results of your efforts to make sure your project is on track. So the “R” was added to the system. MBO&R became the name of the game. Evaluate your SMARTs on a regular basis and adjust your strategies as necessary to keep moving forward on schedule.